An ERNSGA‐III algorithm for the production and distribution planning problem in the multiagent supply chain
From MaRDI portal
(Redirected from Publication:6091879)
Cites work
- A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problems
- A honey-bees optimization algorithm for a two-agent single-machine scheduling problem with ready times
- A Lagrangian approach to single-machine scheduling problems with two competing agents
- A multiple-criterion model for machine scheduling
- An improved version of the augmented \(\varepsilon\)-constraint method (AUGMECON2) for finding the exact Pareto set in multi-objective integer programming problems
- An integrated approach for production and distribution planning in supply chain management
- An integrated production–distribution inventory system involving probabilistic defective and errors in quality inspection under variable setup cost
- Coordination of production and distribution planning
- Heuristic Techniques for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures: Theory and Empirical Comparisons
- scientific article; zbMATH DE number 522739 (Why is no real title available?)
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Integrated Scheduling of Production and Distribution Operations
- Machine scheduling with transportation considerations
- Multi-objective optimization using evolutionary algorithms
- Multiagent scheduling. Models and algorithms
- On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date
- Parallel machines scheduling to minimize job tardiness and machine deteriorating cost with deteriorating jobs
- Pareto simulated annealing—a metaheuristic technique for multiple‐objective combinatorial optimization
- Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and distribution cost
- Scheduling Problems with Two Competing Agents
- Single machine batch scheduling with release times and delivery costs
- Single machine scheduling with batch deliveries
- Supply Chain Scheduling: Batching and Delivery
- The integrated production and transportation scheduling problem for a product with a short lifespan
Cited in
(4)- A mixed‐integer linear programming model and a metaheuristic approach for the selection and allocation of land parcels problem
- Coordinated optimized scheduling of locks and transshipment in inland waterway transportation using binary NSGA‐II
- A two‐layer approach for solving robust decentralized multiproject scheduling problem with multi‐skilled staff
- A review on integrated scheduling and outbound vehicle routing problems
This page was built for publication: An ERNSGA‐III algorithm for the production and distribution planning problem in the multiagent supply chain
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6091879)