Hybrid metaheuristics to solve a multiproduct two‐stage capacitated facility location problem
From MaRDI portal
Publication:6092543
DOI10.1111/itor.12930MaRDI QIDQ6092543
Rômulo Louzada Rabello, Unnamed Author, Glaydston Mattos Ribeiro, Geraldo Regis Mauri, Luiz Antonio Nogueira Lorena, Antônio Augusto Chaves
Publication date: 23 November 2023
Published in: International Transactions in Operational Research (Search for Journal in Brave)
biased random-key genetic algorithmclustering searchmultiproducttwo-stage capacitated facility location
Cites Work
- Unnamed Item
- Optimization by Simulated Annealing
- Facility location models for distribution system design
- Meta-heuristic approaches with memory and evolution for a multi-product production/distribution system design problem
- Facility location and supply chain management. A review
- A multi-commodity, multi-plant, capacitated facility location problem: Formulation and efficient heuristic solution.
- A biased random-key genetic algorithm for the project scheduling problem with flexible resources
- A biased random-key genetic algorithm for the tree of hubs location problem
- Multi-level facility location problems
- Biased random-key genetic algorithms with applications in telecommunications
- Lower and upper bounds for a two-stage capacitated facility location problem with handling costs
- A clustering search metaheuristic for the point-feature cartographic label placement problem
- Error Detecting and Error Correcting Codes
- A biased random‐key genetic algorithm for scheduling heterogeneous multi‐round systems
- An extended Akers graphical method with a biased random‐key genetic algorithm for job‐shop scheduling
- Benchmarking optimization software with performance profiles.
- A biased‐randomized algorithm for redistribution of perishable food inventories in supermarket chains
- A hybrid data mining heuristic to solve the point‐feature cartographic label placement problem
This page was built for publication: Hybrid metaheuristics to solve a multiproduct two‐stage capacitated facility location problem