On the time and aggregate claim amount until the surplus drops below zero or reaches a safety level in a jump diffusion risk model
From MaRDI portal
(Redirected from Publication:6121111)
Recommendations
- On the number of claims until ruin in a two-barrier renewal risk model with Erlang mixtures
- On the time and the number of claims when the surplus drops below a certain level
- On the time to ruin and the deficit at ruin in a risk model with double-sided jumps
- Ruin time and aggregate claim amount up to ruin time for the perturbed risk process
- The maximum surplus before ruin and related problems in a jump-diffusion renewal risk process
Cites work
- A two-sided first-exit problem for a compound Poisson process with a random upper boundary
- Exit times, overshoot and undershoot for a surplus process in the presence of an upper barrier
- How many claims does it take to get ruined and recovered?
- scientific article; zbMATH DE number 3493681 (Why is no real title available?)
- Joint densities involving the time to ruin in the Sparre Andersen risk model under exponential assumptions
- Joint density of the number of claims until ruin and the time to ruin in the delayed renewal risk model with Erlang(\(n\)) claims
- Moment-based approximations of distributions using mixtures: Theory and applications
- On the class of Erlang mixtures with risk theoretic applications
- On the number of claims until ruin in a two-barrier renewal risk model with Erlang mixtures
- On the time and the number of claims when the surplus drops below a certain level
- Ruin probabilities
- The distributions of the time to reach a given level and the duration of negative surplus in the Erlang(2) risk model
- The expected discounted penalty function: from infinite time to finite time
- The joint distribution of the time to ruin and the number of claims until ruin in the classical risk model
- The time of recovery and the maximum severity of ruin in a Sparre Andersen model
- The time to ruin and the number of claims until ruin for phase-type claims
- When does the surplus reach a given target?
Cited in
(2)
This page was built for publication: On the time and aggregate claim amount until the surplus drops below zero or reaches a safety level in a jump diffusion risk model
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6121111)