A note on the shifting bottleneck procedure for job shop scheduling
From MaRDI portal
Publication:6136083
DOI10.1007/S10951-022-00773-3zbMATH Open1520.90105OpenAlexW4317934673MaRDI QIDQ6136083FDOQ6136083
Publication date: 28 August 2023
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-022-00773-3
Recommendations
- The Shifting Bottleneck Procedure for Job Shop Scheduling
- The generalized shifting bottleneck procedure
- Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problem
- A modified shifting bottleneck procedure for job-shop scheduling
- Machine Criticality Measures and Subproblem Solution Procedures in Shifting Bottleneck Methods: A Computational Study
Cites Work
Cited In (1)
This page was built for publication: A note on the shifting bottleneck procedure for job shop scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6136083)