Single machine slack due window assignment and deteriorating jobs
From MaRDI portal
Publication:6149338
DOI10.3934/jimo.2023136OpenAlexW4387663802MaRDI QIDQ6149338
Ji-Bo Wang, Jing Xue, Xin-Na Geng, Li-Han Zhang
Publication date: 5 February 2024
Published in: Journal of Industrial and Management Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3934/jimo.2023136
Nonconvex programming, global optimization (90C26) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Minsum and minmax scheduling on a proportionate flowshop with common flow-allowance
- Models and algorithms of time-dependent scheduling
- A concise survey of scheduling with time-dependent processing times
- Minmax common flow-allowance problems with convex resource allocation and position-dependent workloads
- Minmax due-date assignment on a two-machine flowshop
- Bicriterion scheduling with group technology and deterioration effect
- Single-machine scheduling with deteriorating jobs under a series-parallel graph constraint
- Resource allocation flowshop scheduling with learning effect and slack due window assignment
- Scheduling with time dependent processing times: Review and extensions
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Group scheduling with deteriorating jobs and allotted resource under limited resource availability constraint
- Flow Shop Resource Allocation Scheduling with Due Date Assignment, Learning Effect and Position-Dependent Weights
- Common Due Window Assignment Scheduling with Proportional Linear Deterioration Effects
- Multi-Machine Scheduling With Linear Deterioration
This page was built for publication: Single machine slack due window assignment and deteriorating jobs