Scheduling multiple types of equipment in an automated warehouse
DOI10.1007/S10479-022-04935-6zbMATH Open1517.90065OpenAlexW4296349254MaRDI QIDQ6160965FDOQ6160965
Authors: Lu Zhen, Jing-Wen Wu, Haolin Li, Zheyi Tan, Yingying Yuan
Publication date: 26 June 2023
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-022-04935-6
Recommendations
- Integrated scheduling of handling equipment at automated container terminals
- Order picking problem in a multi-aisle automated warehouse served by a single storage/retrieval machine
- Scheduling the truckload operations in automatic warehouses
- Integrated optimization of mixed cargo packing and cargo location assignment in automated storage and retrieval systems
- Order batching in an automated warehouse with several vertical lift modules: optimization and experiments with real data
Approximation methods and heuristics in mathematical programming (90C59) Queues and service in operations research (90B22) Deterministic scheduling theory in operations research (90B35) Mixed integer programming (90C11) Transportation, logistics and supply chain management (90B06)
Cites Work
- A survey on single crane scheduling in automated storage/retrieval systems
- Robust storage assignment in stack- and queue-based storage systems
- Parts-to-picker based order processing in a rack-moving mobile robots environment
- Warehousing in the e-commerce era: a survey
- A tool for time, variance and energy related performance estimations in a shuttle-based storage and retrieval system
- A new solution approach for multi-stage semi-open queuing networks: an application in shuttle-based compact storage systems
- Planning and control of autonomous mobile robots for intralogistics: literature review and research agenda
- Retrieval scheduling in crane-based 3D automated retrieval and storage systems with shuttles
- Logic-based Benders decomposition for scheduling a batching machine
- Spatial and temporal optimization for smart warehouses with fast turnover
Cited In (3)
This page was built for publication: Scheduling multiple types of equipment in an automated warehouse
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6160965)