Economic lot sizing problem with tank scheduling
From MaRDI portal
Publication:6167403
DOI10.1016/j.ejor.2022.11.016MaRDI QIDQ6167403
Wilco van den Heuvel, Erinc Albey, Meryem Merve Dereli, Mehmet Önal
Publication date: 10 July 2023
Published in: European Journal of Operational Research (Search for Journal in Brave)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups
- Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic
- Polynomial time algorithms for the constant capacitated single-item lot sizing problem with stepwise production cost
- Production lot-sizing with dynamic capacity adjustment
- Dynamic Version of the Economic Lot Size Model
- Economic lot sizing with constant capacities and concave inventory costs
- Deterministic Production Planning: Algorithms and Complexity
- Computational Complexity of the Capacitated Lot Size Problem
- Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case
- Bounded Production and Inventory Models with Piecewise Concave Costs
- Multiperiod production planning carrying over set-up time
- An O(T3) Algorithm for the Economic Lot-Sizing Problem with Constant Capacities
- Solving Linear Programs in the Current Matrix Multiplication Time
- Deterministic Production Planning with Concave Costs and Capacity Constraints
- Algorithms for Single-Item Lot-Sizing Problems with Constant Batch Size
This page was built for publication: Economic lot sizing problem with tank scheduling