Supply chain network design with considerations for modular assembly
Summary: We present a supply chain optimisation model that simultaneously considers sourcing decisions for each part in a complex multi-level bill of materials (BOM) but decides on which should be assembled into subassemblies or modules. Indeed, some parts in the BOM are flexible in the sense that they can be grouped with other parts or subassemblies to form modules. The problem is to find the composition of the modules and the assignment of modules and parts to subcontractors while minimising the overall supply chain cost. The problem considered is one faced by a jet engine manufacturer when designing its multi-echelon, multi-period, multi-product supply chain network with deterministic demand. The mixed integer programming model considers multiple sourcing where the number of parts sourced from a business partner must exceed a lower bound as dictated by purchasing contracts. Computational results are presented for different scenarios allowing the combined analysis of supply chain design and supplier relationships.
- A multi-stage supply chain network design problem with in-house production and partial product outsourcing
- An optimization model for selecting a product family and designing its supply chain
- A strategic model for supply chain design with logical constraints: Formulation and solution.
- Optimizing the Supply Chain Configuration for New Products
- Profit oriented supply chain network optimization
This page was built for publication: Supply chain network design with considerations for modular assembly
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q617084)