scientific article; zbMATH DE number 7731405
From MaRDI portal
Publication:6176799
Recommendations
- A fuzzy approach to construction project risk assessment and analysis: Construction project risk management system
- Major project risk assessment method based on BP neural network
- Dynamic risk evaluation method for collapse disasters of drill-and-blast tunnels: a case study
- Evaluating risks using simulated annealing and building information modeling
- Adaptive control theory and index system for social stability risk assessment of major projects: based on 22 typical cases
Cited in
(9)- Major project risk assessment method based on BP neural network
- Waterlogging hazard assessment of deep foundation pit projects based on FOWA operator and gray clustering
- Automatic Risk Control Based on FSA Methodology Adaptation for Safety Assessment in Intelligent Buildings
- A projection analysis of \(C^2 R\) models applied in grey prediction on OHASA18001 safety investment and benefit of a mining industry
- Adaptive control theory and index system for social stability risk assessment of major projects: based on 22 typical cases
- A fuzzy approach to construction project risk assessment and analysis: Construction project risk management system
- An efficient method for identification of risk factors
- scientific article; zbMATH DE number 7731406 (Why is no real title available?)
- Occupational health and safety risk assessment using an integrated SWARA-MABAC model under bipolar fuzzy environment
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6176799)