A rolling horizon framework for the time‐dependent multi‐visit dynamic safe street snow plowing problem
From MaRDI portal
Publication:6196867
DOI10.1002/NET.22189OpenAlexW4387398698MaRDI QIDQ6196867FDOQ6196867
Authors:
Publication date: 15 March 2024
Published in: Networks (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/net.22189
Recommendations
- Optimization models for a real-world snow plow routing problem
- Synchronized arc routing for snow plowing operations
- Plowing with precedence: a variant of the windy postman problem
- Solving the large-scale min-max \(k\)-rural postman problem for snow plowing
- Arc routing with precedence constraints: an application to snow plowing operations
Programming involving graphs or networks (90C35) Transportation, logistics and supply chain management (90B06)
Cites Work
- A general heuristic for vehicle routing problems
- A survey of models and algorithms for winter road maintenance. III: Vehicle routing and depot location for spreading
- A survey of models and algorithms for winter road maintenance. I: System design for spreading and plowing
- A survey of models and algorithms for winter road maintenance. II: System design for snow disposal
- Plowing with precedence: a variant of the windy postman problem
- Synchronized arc routing for snow plowing operations
- A survey of models and algorithms for winter road maintenance. IV: Vehicle routing and fleet sizing for plowing and snow disposal
This page was built for publication: A rolling horizon framework for the time‐dependent multi‐visit dynamic safe street snow plowing problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6196867)