Project scheduling with finite or infinite number of activity processing modes -- a survey

From MaRDI portal
Publication:621683

DOI10.1016/j.ejor.2010.03.037zbMath1208.90082OpenAlexW1967545722MaRDI QIDQ621683

Marek Mika, Joanna Józefowska, Grzegorz Waligóra, Jan Weglarz

Publication date: 28 January 2011

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2010.03.037




Related Items (66)

Scheduling shared continuous resources on many-coresEnergetic reasoning and mixed-integer linear programming for scheduling with a continuous resource and linear efficiency functionsScheduling under a non-reversible energy source: an application of piecewise linear bounding of non-linear demand/cost functionsA heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraintsAn automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problemMIP models for resource-constrained project scheduling with flexible resource profilesA tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphsComplexity results for the linear time-cost tradeoff problem with multiple milestones and completely ordered jobsMulti-mode resource constrained multi-project scheduling and resource portfolio problemA hybrid simulation-optimization approach for the robust discrete time/cost trade-off problemMin-Max Regret Version of the Linear Time–Cost Tradeoff Problem with Multiple Milestones and Completely Ordered JobsAn effective approach for scheduling coupled activities in development projectsA continuous time-cost tradeoff problem with multiple milestones and completely ordered jobsScheduling resource-constrained projects with a flexible project structureSolving multi-mode time–cost–quality trade-off problems under generalized precedence relationsComparative Analysis of Some Metaheuristics for Discrete-Continuous Project Scheduling with Activities of Identical Processing RatesMulti-mode resource-constrained project scheduling problems with non-preemptive activity splittingMultimode time-cost-robustness trade-off project scheduling problem under uncertaintyVariable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gapTotal completion time minimization for machine scheduling problem under time windows constraints with jobs' linear processing rate functionA Petri net-based framework for realistic project management and scheduling: an application in animation and videogamesFormulating and solving a multi-mode resource-collaboration and constrained scheduling problem (MRCCSP)A biased random-key genetic algorithm for the project scheduling problem with flexible resourcesOptimizing temporary work and overtime in the time cost quality trade-off problemScheduling interrelated activities in complex projects under high-order rework: a DSM-based approachSimple matching vs linear assignment in scheduling models with positional effects: a critical reviewImpacts of synergies on software project schedulingA hybrid exact method for a scheduling problem with a continuous resource and energy constraintsProject scheduling to minimize the makespan under flexible resource profiles and marginal diminishing returns of the resourceModeling frameworks for the multi‐skill resource‐constrained project scheduling problem: a theoretical and empirical comparisonLocal search approaches for the test laboratory scheduling problem with variable task groupingThe contractor time–cost–credit trade‐off problem: integer programming model, heuristic solution, and business insightsProject scheduling problem with fuzzy activity durations: a novel operational law based solution frameworkTabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertaintyA linear time-cost tradeoff problem with multiple milestones under a comb graphMIP heuristics for a resource constrained project scheduling problem with workload stability constraintsScheduling personnel for the build-up of unit load devices at an air cargo terminal with limited spaceSingle-machine scheduling of multiple projects with controllable processing timesA game theoretical approach to sharing penalties and rewards in projectsAn applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resourcesPower-aware scheduling of preemptable jobs on identical parallel processors to meet deadlinesTime and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centresModelling and solving grid resource allocation problem with network resources for workflow applicationsBranch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurementPolyhedral results and valid inequalities for the continuous energy-constrained scheduling problemThe preemptive stochastic resource-constrained project scheduling problemScheduling aspects in keyword extraction problemA local search framework for industrial test laboratory schedulingAn updated survey of variants and extensions of the resource-constrained project scheduling problemResource tardiness weighted cost minimization in project schedulingInteger programming models for mid-term production planning for high-tech low-volume supply chainsMode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problemA multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problemA hybrid metaheuristic for resource-constrained project scheduling with flexible resource profilesMulti-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policiesMetaheuristics for multi-mode capital-constrained project payment schedulingAn experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instancesRevenue sharing for resource transfer among projectsMaximising the weighted number of activity execution modes in project planningA modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splittingA unified view of parallel machine scheduling with interdependent processing ratesSimulated annealing for financing cost distribution based project payment scheduling from a joint perspectiveDiscrete-continuous project scheduling with discounted cash inflows and various payment models -- a review of recent resultsA decomposed branch-and-price procedure for integrating demand planning in personnel staffing problemsActivities planning and resources assignment on distinct places: a mathematical modelPersonnel scheduling and supplies provisioning in emergency relief operations


Uses Software


Cites Work


This page was built for publication: Project scheduling with finite or infinite number of activity processing modes -- a survey