System reliability for quickest path problems under time threshold and budget
From MaRDI portal
Publication:623173
DOI10.1016/j.camwa.2010.08.026zbMath1205.68098OpenAlexW2088717497MaRDI QIDQ623173
Publication date: 13 February 2011
Published in: Computers \& Mathematics with Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.camwa.2010.08.026
Network design and communication in computer systems (68M10) Reliability, availability, maintenance, inspection in operations research (90B25) Reliability, testing and fault tolerance of networks and computer systems (68M15)
Cites Work
- Internet packet routing: application of a \(K\)-quickest path algorithm
- The quickest path problem
- Minimum cost-reliability ratio path problem
- Distributed algorithms for the quickest path problem
- An algorithm for finding the \(k\) quickest paths in a network
- On the quickest path problem
- Algorithms for the constrained quickest path problem and the enumeration of quickest paths
- Finding the \(k\) quickest simple paths in a network
- An algorithm for the quickest path problem
- Minimum time paths in a network with mixed time constraints.
- Extend the quickest path problem to the system reliability evaluation for a stochastic-flow network
- A label-setting algorithm for finding a quickest path
- An algorithm for ranking quickest simple paths
- The all-pairs quickest path problem
- On a multicommodity stochastic-flow network with unreliable nodes subject to budget constraint
- Reliability Bounds for Multistate Systems with Multistate Components
- Reliability Evaluation of Multistate Systems with Multistate Components
- Deterministic network optimization: A bibliography
- Reliability evaluation of a limited-flow network in terms of minimal cutsets
- On reliability evaluation of a capacitated‐flow network in terms of minimal pathsets
- Fibonacci heaps and their uses in improved network optimization algorithms
This page was built for publication: System reliability for quickest path problems under time threshold and budget