Risk-Constrained Microgrid Reconfiguration Using Group Sparsity
From MaRDI portal
Publication:6242524
arXiv1306.1820MaRDI QIDQ6242524FDOQ6242524
Georgios B. Giannakis, Emiliano Dall'Anese
Publication date: 7 June 2013
Abstract: The system reconfiguration task is considered for existing power distribution systems and microgrids, in the presence of renewable-based generation and load foresting errors. The system topology is obtained by solving a chance-constrained optimization problem, where loss-of-load (LOL) constraints and Ampacity limits of the distribution lines are enforced. Similar to various distribution system reconfiguration renditions, solving the resultant problem is computationally prohibitive due to the presence of binary line selection variables. Further, lack of closed form expressions for the joint probability distribution of forecasting errors hinders tractability of LOL constraints. Nevertheless, a convex problem re-formulation is developed here by resorting to a scenario approximation technique, and by leveraging the underlying group-sparsity attribute of currents flowing on distribution lines equipped with tie and sectionalizing switches. The novel convex LOL-constrained reconfiguration scheme can also afford a distributed solution using the alternating direction method of multipliers, to address the case where multi-facilities are managed autonomously from the rest of the system.
This page was built for publication: Risk-Constrained Microgrid Reconfiguration Using Group Sparsity
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6242524)