Optimal Investment on Series FACTS Devices Considering Contingencies
From MaRDI portal
Publication:6284941
DOI10.1109/NAPS.2016.7747948arXiv1703.10278MaRDI QIDQ6284941FDOQ6284941
Authors: Xiao-Hu Zhang, Kevin Tomsovic, Aleksandar Dimitrovski
Publication date: 29 March 2017
Abstract: Series FACTS devices are capable of relieving congestion and reducing generation costs in the power system. This paper proposes a planning model to optimally allocate TCSCs in the transmission network considering the base case and contingencies. We consider a single target year and select three distinct load patterns to accommodate the yearly load profile. A reformulation technique is utilized to linearize the nonlinear power flow constraint introduced by a TCSC. Numerical case studies based on the IEEE 118-bus system demonstrate the high performance of the proposed planning model.
This page was built for publication: Optimal Investment on Series FACTS Devices Considering Contingencies
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6284941)