On Robust Tie-line Scheduling in Multi-Area Power Systems

From MaRDI portal
Publication:6285864

arXiv1704.07025MaRDI QIDQ6285864FDOQ6285864


Authors: Ye Guo, Subhonmesh Bose, Lang Tong Edit this on Wikidata


Publication date: 23 April 2017

Abstract: The tie-line scheduling problem in a multi-area power system seeks to optimize tie-line power flows across areas that are independently operated by different system operators (SOs). In this paper, we leverage the theory of multi-parametric linear programming to propose algorithms for optimal tie-line scheduling within a deterministic and a robust optimization framework. Through a coordinator, the proposed algorithms are proved to converge to the optimal schedule within a finite number of iterations. A key feature of the proposed algorithms, besides their finite step convergence, is the privacy of the information exchanges; the SO in an area does not need to reveal its dispatch cost structure, network constraints, or the nature of the uncertainty set to the coordinator. The performance of the algorithms is evaluated using several power system examples.













This page was built for publication: On Robust Tie-line Scheduling in Multi-Area Power Systems

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6285864)