Gain-Scheduling Controller Synthesis for Nested Systems with Full Block Scalings

From MaRDI portal
Publication:6506747

DOI10.1109/TAC.2023.3329851arXiv2210.03712MaRDI QIDQ6506747FDOQ6506747


Authors: Christian A. Rösinger, Carsten W. Scherer Edit this on Wikidata



Abstract: This work presents a framework to synthesize structured gain-scheduled controllers for structured plants that are affected by time-varying parametric scheduling blocks. Using a so-called lifting approach, we are able to handle several structured gain-scheduling problems arising from a nested inner and outer loop configuration with partial or full dependence on the scheduling block. Our resulting design conditions are formulated in terms of convex linear matrix inequalities and permit to handle multiple performance objectives.













This page was built for publication: Gain-Scheduling Controller Synthesis for Nested Systems with Full Block Scalings

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6506747)