Minimizing total completion time for re-entrant flow shop scheduling problems
From MaRDI portal
(Redirected from Publication:650903)
Recommendations
- Minimizing makespan on an \(m\)-machine re-entrant flowshop
- Minimizing makespan on a two-machine re-entrant flowshop
- Heuristic algorithms for two machine re-entrant flow shop
- Minimizing total tardiness on a two-machine re-entrant flowshop
- A heuristic algorithm for two-machine re-entrant shop scheduling
Cites work
- A heuristic algorithm for two-machine re-entrant shop scheduling
- Heuristic algorithms for two machine re-entrant flow shop
- Mean Flow Time Minimization in Reentrant Job Shops with a Hub
- Minimizing Makespan in a Class of Reentrant Shops
- Minimizing makespan in re-entrant permutation flow-shops
- Minimizing makespan on a two-machine re-entrant flowshop
- Minimizing makespan on an \(m\)-machine re-entrant flowshop
- Minimizing total tardiness on a two-machine re-entrant flowshop
- Multi-family scheduling in a two-machine reentrant flow shop with setups
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- The Complexity of Flowshop and Jobshop Scheduling
Cited in
(14)- scientific article; zbMATH DE number 6719013 (Why is no real title available?)
- Minimizing Mean Completion Time for Special Flowshop Problems
- Makespan minimization in reentrant flow shop problem with identical jobs
- Mean Flow Time Minimization in Reentrant Job Shops with a Hub
- Effective upper and lower bounds for a two-stage reentrant flexible flow shop scheduling problem
- Scheduling reentrant jobs on parallel machines with a remote server
- Minimizing makespan in re-entrant permutation flow-shops
- Reentrant hybrid flowshop scheduling problem based on total weighted completion time
- New efficient algorithms for the two-machine no-wait chain-reentrant shop problem
- Flow shops with reentry: the total weighted completion time objective
- Minimizing total tardiness on a two-machine re-entrant flowshop
- Minimizing total completion time for flowshop scheduling problem with uncertain processing times
- Minimizing makespan on an \(m\)-machine re-entrant flowshop
- Single machine scheduling with re-entrance
This page was built for publication: Minimizing total completion time for re-entrant flow shop scheduling problems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q650903)