Metaheuristics for the bi-objective resource-constrained project scheduling problem with time-dependent resource costs: an experimental comparison
From MaRDI portal
(Redirected from Publication:6551095)
Cites work
- A branch-price-and-cut algorithm for multi-mode resource leveling
- A comparative study on multiobjective metaheuristics for solving constrained in-core fuel management optimisation problems
- A comparison of two meta-heuristics for the pickup and delivery problem with transshipment
- A reference point-based evolutionary algorithm for approximating regions of interest in multiobjective problems
- A robust genetic algorithm for resource allocation in project scheduling
- A survey of variants and extensions of the resource-constrained project scheduling problem
- A tutorial on multiobjective optimization: fundamentals and evolutionary methods
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
- Bi-objective parallel machine scheduling with additional resources during setups
- Designing a sustainable supply chain network integrated with vehicle routing: a comparison of hybrid swarm intelligence metaheuristics
- Direct Multisearch for Multiobjective Optimization
- Effective implementation of the \(\varepsilon \)-constraint method in multi-objective mathematical programming problems
- Evolutionary Multi-Criterion Optimization
- scientific article; zbMATH DE number 5132361 (Why is no real title available?)
- scientific article; zbMATH DE number 1300399 (Why is no real title available?)
- MOCell: A cellular genetic algorithm for multiobjective optimization
- Performance indicators in multiobjective optimization
- Project scheduling under uncertainty: survey and research potentials
- PSPLIB -- a project scheduling problem library
- Resource-constrained project scheduling by simulated annealing
- Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization
- Scheduling subject to resource constraints: Classification and complexity
- Stochastic project networks. Temporal analysis, scheduling and cost minimization
Cited in
(3)
This page was built for publication: Metaheuristics for the bi-objective resource-constrained project scheduling problem with time-dependent resource costs: an experimental comparison
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6551095)