Robust optimization for a steel production planning problem with uncertain demand and product substitution
From MaRDI portal
(Redirected from Publication:6561215)
Cites work
- A heuristic approach for the integrated production-transportation problem with process flexibility
- A robust optimization model for multi-product two-stage capacitated production planning under uncertainty
- A two-stage robust optimization approach for the mobile facility fleet sizing and routing problem under uncertainty
- An exact robust approach for the integrated berth allocation and quay crane scheduling problem under uncertain arrival times
- Bilinear programming: An exact algorithm
- Efficient reformulations for dynamic lot-sizing problems with product substitution
- Fix-and-optimize heuristics for capacitated lot-sizing with sequence-dependent setups and substitutions
- Integrated charge batching and casting width selection at Baosteel
- Multi‐level, multi‐stage lot‐sizing and scheduling in the flexible flow shop with demand information updating
- Production planning with order acceptance and demand uncertainty
- Robust optimization for lot-sizing problems under yield uncertainty
- Semiconductor lot allocation using robust optimization
- Solving two-stage robust optimization problems using a column-and-constraint generation method
- The Price of Robustness
- Theory and applications of robust optimization
- Two-Stage Robust Network Flow and Design Under Demand Uncertainty
Cited in
(3)- An interval two-stage robust stochastic programming under a bi-level multi-objective framework toward river basin water resources allocation
- Joint optimization of dynamic pricing, quality, and production quantity in the presence of online reviews: a distributionally robust optimization approach
- Construction of new data-driven uncertainty sets imbedded with fuzzy prejudgment: validated by robust optimization to newsboy problems
This page was built for publication: Robust optimization for a steel production planning problem with uncertain demand and product substitution
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6561215)