Minimizing the number of late jobs on a single machine under due date uncertainty
DOI10.1007/S10951-010-0183-ZzbMATH Open1229.90053OpenAlexW1994217000MaRDI QIDQ657256FDOQ657256
Mohamed Ali Aloulou, M. Y. Kovalyov, Hassene Aissi
Publication date: 16 January 2012
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-010-0183-z
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35) Dynamic programming (90C39) Abstract computational complexity for mathematical programming problems (90C60)
Cites Work
- Title not available (Why is that?)
- Robust discrete optimization and its applications
- Maximum matching of given weight in complete and complete bipartite graphs
- Scheduling Problems with Two Competing Agents
- Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs
- An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
- Complexity of single machine scheduling problems under scenario-based uncertainty
- Matching is as easy as matrix inversion
- The complexity of restricted spanning tree problems
- Complexity of the min-max and min-max regret assignment problems
Cited In (19)
- Single machine scheduling problems with uncertain parameters and the OWA criterion
- Robust scheduling to minimize the weighted number of late jobs with interval due-date uncertainty
- Scenario based robust line balancing: Computational complexity
- Min-max and min-max (relative) regret approaches to representatives selection problem
- Lawler's minmax cost algorithm: optimality conditions and uncertainty
- Risk-averse single machine scheduling: complexity and approximation
- A robust two-machine flow-shop scheduling model with scenario-dependent processing times
- Single machine scheduling with multiple common due date assignment and aging effect under a deteriorating maintenance activity consideration
- Single machine scheduling to minimize the number of late jobs under uncertainty.
- Min-max regret version of a scheduling problem with outsourcing decisions under processing time uncertainty
- A state-of-the-art survey on multi-scenario scheduling
- Lawler's minmax cost problem under uncertainty
- Robust Single Machine Scheduling Problem with Weighted Number of Late Jobs Criterion
- Just-in-time scheduling under scenario-based uncertainty
- Min–max version of single-machine scheduling with generalized due dates under scenario-based uncertainty
- Using Lagrangean relaxation to minimize the weighted number of late jobs on a single machine
- Parameterized multi-scenario single-machine scheduling problems
- Complexity results for common due date scheduling problems with interval data and minmax regret criterion
- Minimizing the number of tardy jobs in two-machine settings with common due date
Recommendations
- Min–max version of single-machine scheduling with generalized due dates under scenario-based uncertainty 👍 👎
- Robust scheduling to minimize the weighted number of late jobs with interval due-date uncertainty 👍 👎
- Robust Single Machine Scheduling Problem with Weighted Number of Late Jobs Criterion 👍 👎
- Single machine scheduling to minimize the number of late jobs under uncertainty. 👍 👎
- Minimizing The Range Of Lateness On A Single Machine Under Generalized Due Dates 👍 👎
This page was built for publication: Minimizing the number of late jobs on a single machine under due date uncertainty