Eco-energy-efficient simultaneous lot-sizing and scheduling: a tri-criteria problem
From MaRDI portal
Publication:6606546
Recommendations
- Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption
- Unrelated parallel machine energy-efficient scheduling considering sequence-dependent setup times and time-of-use electricity tariffs
- Energy-aware production scheduling with power-saving modes
- A multi-criteria MILP formulation for energy aware hybrid flow shop scheduling
- The green capacitated multi-item lot sizing problem with parallel machines
Cites work
This page was built for publication: Eco-energy-efficient simultaneous lot-sizing and scheduling: a tri-criteria problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6606546)