Efficient non-probabilistic parallel model updating based on analytical correlation propagation formula and derivative-aware deep neural network metamodel
From MaRDI portal
Publication:6663301
DOI10.1016/J.CMA.2024.117490MaRDI QIDQ6663301FDOQ6663301
Authors: Jiang Mo, Wang-Ji Yan, Ka-Veng Yuen, Michael A. Beer
Publication date: 14 January 2025
Published in: Computer Methods in Applied Mechanics and Engineering (Search for Journal in Brave)
Recommendations
- Bayesian structural model updating with multimodal variational autoencoder
- Novel gradient-enhanced Bayesian neural networks for uncertainty propagation
- Structural reliability analysis with parametric p-box uncertainties via a Bayesian updating BDRM
- An interval model updating method based on meta-model and response surface reconstruction
neural networkmodel updatingblock coordinate descentnon-probabilistic uncertaintycorrelation propagationderivative-aware metamodel
Cites Work
- Convergence of a block coordinate descent method for nondifferentiable minimization
- Deep learning
- Introduction to Interval Analysis
- Model Updating In Structural Dynamics: A Survey
- The static displacement and the stress analysis of structures with bounded uncertainties using the vertex solution theorem
- Correlation analysis of non-probabilistic convex model and corresponding structural reliability technique
- A survey of non-probabilistic uncertainty treatment in finite element analysis
- Identification and quantification of multivariate interval uncertainty in finite element models
- Hybrid uncertain analysis of acoustic field with interval random parameters
- Multidimensional parallelepiped model -- a new type of non-probabilistic convex model for structural uncertainty analysis
- Correlation propagation for uncertainty analysis of structures based on a non-probabilistic ellipsoidal model
- Discussions on non-probabilistic convex modelling for uncertain problems
- Title not available (Why is that?)
- Interval field model and interval finite element analysis
- A modified parallelepiped model for non-probabilistic uncertainty quantification and propagation analysis
- Novel data-driven method for non-probabilistic uncertainty analysis of engineering structures based on ellipsoid model
- A level set reliability-based topology optimization (LS-RBTO) method considering sensitivity mapping and multi-source interval uncertainties
- A data-driven force-thermal coupling load identification method considering multi-source uncertainties of structural characteristics and measuring noises
- Convex model-based regularization method for force reconstruction
Cited In (2)
This page was built for publication: Efficient non-probabilistic parallel model updating based on analytical correlation propagation formula and derivative-aware deep neural network metamodel
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6663301)