Production planning of a failure-prone manufacturing system under different setup scenarios
From MaRDI portal
Publication:670254
DOI10.1155/2016/4930817zbMath1435.90061DBLPjournals/jam/KiboukaNKSP16OpenAlexW2261682292WikidataQ59125202 ScholiaQ59125202MaRDI QIDQ670254
Vladimir Polotski, Donatien Nganga-Kouya, Victor Songmene, Guy-Richard Kibouka, Jean-Pierre Kenné
Publication date: 18 March 2019
Published in: Journal of Applied Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2016/4930817
Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30) Optimal stochastic control (93E20)
Cites Work
- Failure-prone manufacturing systems with setups: feasibility and optimality under various hypotheses about perturbations and setup interplay
- Single-machine scheduling problems with past-sequence-dependent setup times
- Optimal control of production rate in a failure prone manufacturing system
- A numerical method in optimal production and setup scheduling of stochastic manufacturing systems
- Production and set-up control of a failure-prone manufacturing system
- Operational level-based policies in production rate control of unreliable manufacturing systems with set-ups
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: Production planning of a failure-prone manufacturing system under different setup scenarios