Batch scheduling in a two-machine flow shop with limited buffer
From MaRDI portal
Publication:674441
DOI10.1016/0166-218X(95)00114-7zbMATH Open0869.90033MaRDI QIDQ674441FDOQ674441
Alessandro Agnetis, Dario Pacciarelli, Fabrizio Rossi
Publication date: 5 March 1997
Published in: Discrete Applied Mathematics (Search for Journal in Brave)
Full work available at URL: http://www.elsevier.com/locate/dam
Recommendations
- scientific article; zbMATH DE number 764416
- Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times.
- An exact algorithm for the batch sequencing problem in a two-machine flow shop with limited buffer
- A TWO-STAGE FLOWSHOP SCHEDULING WITH LIMITED BUFFER STORAGE
Cites Work
- Title not available (Why is that?)
- Optimal two- and three-stage production schedules with set-up time included
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem
- Solution of the Flowshop-Scheduling Problem with No Intermediate Queues
- Batch scheduling in a two-machine flow shop with limited buffer
- Flowshop scheduling with limited temporary storage
- Title not available (Why is that?)
Cited In (15)
- A two-machine flowshop problem with processing time-dependent buffer constraints-an application in multimedia presentations
- Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times.
- Title not available (Why is that?)
- Title not available (Why is that?)
- Batch scheduling in the no-wait two-machine flowshop to minimize the makespan
- An exact approach for batch scheduling in flexible flow lines with limited intermediate buffers.
- A TWO-STAGE FLOWSHOP SCHEDULING WITH LIMITED BUFFER STORAGE
- An exact algorithm for the batch sequencing problem in a two-machine flow shop with limited buffer
- ON AN AUTOMATED TWO-MACHINE FLOWSHOP SCHEDULING PROBLEM WITH INFINITE BUFFER
- Impact of finite buffers on the optimal scheduling of a single-machine two-part-type manufacturing system
- Formulating and solving a multi-mode resource-collaboration and constrained scheduling problem (MRCCSP)
- Batch scheduling in a two-machine flow shop with limited buffer
- Optimal versus heuristic scheduling of surface mount technology lines
- MIP Formulations for Flowshop Scheduling with Limited Buffers
- Title not available (Why is that?)
This page was built for publication: Batch scheduling in a two-machine flow shop with limited buffer
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q674441)