Tradeoff between setup times and carrying costs for finished items
From MaRDI portal
Publication:690011
DOI10.1016/0305-0548(93)90057-PzbMath0801.90064OpenAlexW2079771058MaRDI QIDQ690011
Publication date: 20 December 1993
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0305-0548(93)90057-p
Deterministic scheduling theory in operations research (90B35) Computational methods for problems pertaining to operations research and mathematical programming (90-08)
Related Items
Cites Work
- Unnamed Item
- Unnamed Item
- Single facility multi-class job scheduling
- Optimal schedules for single facility with two job classes
- Single facility scheduling with multiple job classes
- Solving a bicriterion scheduling problem
- Scheduling with Multiple Performance Measures: The One-Machine Case
- A Dynamic Programming Approach for Sequencing Groups of Identical Jobs
- Choosing the Job Sequence and Processing Times to Minimize Total Processing Plus Flow Cost on a Single Machine
- A note on a scheduling problem with dual criteria
- One machine sequencing to minimize mean flow time with minimum number tardy