A robust lot sizing problem with ill-known demands
From MaRDI portal
Publication:690887
DOI10.1016/J.FSS.2012.01.015zbMATH Open1252.90020arXiv1210.5386OpenAlexW2085683668MaRDI QIDQ690887FDOQ690887
Authors: Romain Guillaume, Przemysław Kobylański, Paweł Zieliński
Publication date: 29 November 2012
Published in: Fuzzy Sets and Systems (Search for Journal in Brave)
Abstract: The paper deals with a lot sizing problem with ill-known demands modeled by fuzzy intervals whose membership functions are possibility distributions for the values of the uncertain demands. Optimization criteria, in the setting of possibility theory, that lead to choose robust production plans under fuzzy demands are given. Some algorithms for determining optimal robust production plans with respect to the proposed criteria, and for evaluating production plans are provided. Some computational experiments are presented.
Full work available at URL: https://arxiv.org/abs/1210.5386
Recommendations
- scientific article; zbMATH DE number 1539059
- Fuzzy chance-constrained programming for lot sizing production planning
- Fuzzy supply chain problem for lot sizing production planning
- Multi-period mixed production planning with uncertain demands: fuzzy and interval fuzzy sets approach
- Lot Size Scheduling using Fuzzy Numbers
Cites Work
- Network flows. Theory, algorithms, and applications.
- Decision-Making in a Fuzzy Environment
- Title not available (Why is that?)
- When upper probabilities are possibility measures
- A procedure for ordering fuzzy subsets of the unit interval
- Robust discrete optimization and its applications
- Minimax regret solution to linear programming problems with an interval objective function
- Uncertainty theory. An introduction to its axiomatic foundations.
- Generalized Benders decomposition
- Information Distortion in a Supply Chain: The Bullwhip Effect
- A single-period inventory model with fuzzy demand
- Fuzzy decision modeling for supply chain management
- Necessary conditions for min-max problems and algorithms by a relaxation procedure
- Title not available (Why is that?)
- Dynamic version of the economic lot size model
- Deterministic Production Planning: Algorithms and Complexity
- Lot sizing and scheduling -- survey and extensions
- Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge
- The Validity of a Family of Optimization Methods
- Impact of information sharing and lead time on bullwhip effect and on-hand inventory
- Fuzzy optimization for supply chain planning under supply, demand and process uncertainties
- Fuzzy-genetic approach to aggregate production-distribution planning in supply chain management
- On latest starting times and floats in activity networks with ill-known durations
- A heuristic to minimax absolute regret for linear programs with interval objective function coefficients
- A single period inventory model with imperfect production and stochastic demand under chance and imprecise constraints
- TECHNICAL NOTE—Solving Linear Cost Dynamic Lot-Sizing Problems in O(n log n) Time
- Material requirement planning with fuzzy constraints and fuzzy coefficients
- A fuzzy linear programming based approach for tactical supply chain planning in an uncertainty environment
- Modeling fuzzy multi-period production planning and sourcing problem with credibility service levels
- Choosing robust solutions in discrete optimization problems with fuzzy costs
- A comprehensive decision making structure for partitioning of make-to-order, make-to-stock and hybrid products
- Title not available (Why is that?)
- Collaborative Planning in Supply Chains
Cited In (12)
- A perfect information lower bound for robust lot-sizing problems
- Semiconductor lot allocation using robust optimization
- Robust optimization for lot-sizing problems under yield uncertainty
- An effective multi-objective particle swarm optimization for the multi-item capacitated lot-sizing problem with set-up times and backlogging
- Single-item dynamic lot-sizing problems: an updated survey
- Capacitated lot size problems with fuzzy capacity
- Mid-term capacity redeployment of Rescue Centers under simultaneous requirements
- Management of the risk of backorders in a MTO-ATO/MTS context under imperfect requirements
- Title not available (Why is that?)
- Multi-period mixed production planning with uncertain demands: fuzzy and interval fuzzy sets approach
- Fuzzy chance-constrained programming for lot sizing production planning
- Robust inventory problem with budgeted cumulative demand uncertainty
Uses Software
This page was built for publication: A robust lot sizing problem with ill-known demands
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q690887)