An alternative to safety stock policies for multi-level rolling schedule MRP problems
From MaRDI portal
(Redirected from Publication:706875)
Recommendations
- Safety Stock versus Safety Time in MRP Controlled Production Systems
- An analysis of multi-level lot-sizing problems with a bottleneck under a rolling schedule environment
- Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system
- Protective stocks in multi-stage production systems
- Setting safety stocks in multi-stage inventory systems under rolling horizon mathematical programming models
Cites work
- scientific article; zbMATH DE number 1050884 (Why is no real title available?)
- An Analytic Framework for Evaluating Rolling Schedules
- Comparative analysis of lot-sizing models for multi-stage systems: a simulation study
- Dynamic version of the economic lot size model
- Improved Heuristics for Multi-Stage Requirements Planning Systems
- Improved rolling schedules for the dynamic single-level lot-sizing problem
- Multiple level production planning in rolling horizon assembly environments
- Production scheduling and sequencing for multi-stage production systems
- Rolling Horizon Procedures for the Facilities in Series Inventory Model with Nested Schedules
Cited in
(5)- The stochastic dynamic product cycling problem
- Supply chain management in forestry -- case studies at Södra cell AB
- Safety Stock versus Safety Time in MRP Controlled Production Systems
- Supply chain management and advanced planning -- basics, overview and challenges
- Setting safety stocks in multi-stage inventory systems under rolling horizon mathematical programming models
This page was built for publication: An alternative to safety stock policies for multi-level rolling schedule MRP problems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q706875)