Production planning with approved vendor matrices for a hard-disk drive manufacturer
From MaRDI portal
Publication:706906
DOI10.1016/J.EJOR.2003.09.012zbMATH Open1071.90525OpenAlexW1986793267MaRDI QIDQ706906FDOQ706906
Authors: D. Kharzeev
Publication date: 9 February 2005
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2003.09.012
Recommendations
- Build-pack planning for hard disk drive assembly with approved vendor matrices and stochastic demands
- A gradient search and column generation approach for the build–pack planning problem with approved vendor matrices and stochastic demand
- Production Planning in Assembly Line Systems
- Production planning problem where products have alternative routings and bills-of-material
- Timed route approaches for large multi-product multi-step capacitated production planning problems
Cites Work
- A Linear Programming Approach to the Cutting-Stock Problem
- Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems
- Progress in Linear Programming-Based Algorithms for Integer Programming: An Exposition
- Title not available (Why is that?)
- A Modified Linear Program for Columnar Methods in Mathematical Programming
Cited In (2)
This page was built for publication: Production planning with approved vendor matrices for a hard-disk drive manufacturer
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q706906)