Event-based MILP models for resource-constrained project scheduling problems

From MaRDI portal
Publication:709100

DOI10.1016/j.cor.2009.12.011zbMath1231.90202OpenAlexW1964195749MaRDI QIDQ709100

Pierre Lopez, Marcel Mongeau, Christian Artigues, Oumar Koné

Publication date: 15 October 2010

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2009.12.011




Related Items (43)

Mixed integer programming formulations for the biomass truck scheduling problemEnergetic reasoning and mixed-integer linear programming for scheduling with a continuous resource and linear efficiency functionsMulti-mode resource constrained project scheduling problem along with contractor selectionMIP models for resource-constrained project scheduling with flexible resource profilesA purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durationsAn integer programming approach to the multimode resource-constrained multiproject scheduling problemModels and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendarsSolving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computationResource-constrained project scheduling with flexible resource profiles in continuous timeA computational study of exact approaches for the adjustable robust resource-constrained project scheduling problemA polyhedral study of event-based models for the resource-constrained project scheduling problemExact Branch-Price-and-Cut for a Hospital Therapist Scheduling Problem with Flexible Service Locations and Time-Dependent Location CapacityLarge-scale periodic scheduling in time-sensitive networksA project scheduling problem with periodically aggregated resource-constraintsMixed-integer linear programming for resource leveling problemsRobust scheduling with budgeted uncertaintyA hybrid exact method for a scheduling problem with a continuous resource and energy constraintsThe total adjustment cost problem: applications, models, and solution algorithmsA preemptive bound for the resource constrained project scheduling problemHorizontally elastic edge-finder algorithm for cumulative resource constraint revisitedAn iterative time‐bucket refinement algorithm for a high‐resolution resource‐constrained project scheduling problemScheduling of network tasks to minimize the consumed energyModeling frameworks for the multi‐skill resource‐constrained project scheduling problem: a theoretical and empirical comparisonNew pseudo polynomial algorithms for a partial resource-constrained project scheduling problemA branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer timesThe vehicle routing problem with time windows and flexible delivery locationsContinuous-time formulations for multi-mode project schedulingThe parcel hub scheduling problem with limited conveyor capacity and controllable unloading speedsRobust energy planning in buildings with energy and comfort costsProject scheduling with flexible resources: formulation and inequalitiesMathematical models for stable matching problems with ties and incomplete listsMulti-parallel work centers scheduling optimization with shared or dedicated resources in low-volume low-variety production systemsTowards merging binary integer programming techniques with genetic algorithmsIntegrated scheduling and batch ordering for construction projectMulti-objective metaheuristic algorithms for the resource-constrained project scheduling problem with precedence relationsScheduling steel plates on a roller furnaceA satisfiability and workload-based exact method for the resource constrained project scheduling problem with generalized precedence constraintsMaximising the weighted number of activity execution modes in project planningRobust allocation of operating rooms: a cutting plane approach to handle lognormal case durationsA mathematical model and algorithms for the aircraft hangar maintenance scheduling problemStrong bounds for resource constrained project scheduling: preprocessing and cutting planesImproved formulations and new valid inequalities for a hybrid flow shop problem with time-varying resources and chaining time-lagA computational study of constraint programming approaches for resource-constrained project scheduling with autonomous learning effects


Uses Software


Cites Work




This page was built for publication: Event-based MILP models for resource-constrained project scheduling problems