A double genetic algorithm for the MRCPSP/max
From MaRDI portal
Publication:709102
Recommendations
- Project scheduling with multiple modes: A genetic algorithm
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms
- Resource-constrained project scheduling: A heuristic for the multi-mode case
- A genetic algorithm for multi-mode resource constrained project scheduling problem
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
Cites work
- scientific article; zbMATH DE number 4135692 (Why is no real title available?)
- scientific article; zbMATH DE number 3497315 (Why is no real title available?)
- scientific article; zbMATH DE number 194544 (Why is no real title available?)
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
- A competitive heuristic solution technique for resource-constrained project scheduling
- A constraint-based method for project scheduling with time windows
- A time-oriented branch-and-bound algorithm for resource-constrained project scheduling with generalised precedence constraints
- Depth-First Search and Linear Graph Algorithms
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- Justification and RCPSP: a technique that pays
- Network flows. Theory, algorithms, and applications.
- Project scheduling with multiple modes: A genetic algorithm
- Project scheduling with time windows and scarce resources. Temporal and resource-constrained project scheduling with regular and nonregular objective functions
- Resource-constrained project scheduling. Exact methods for the multi-mode case
- Resource-constrained project scheduling: A heuristic for the multi-mode case
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Scheduling of Project Networks by Job Assignment
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms
- The multi-mode resource-constrained project scheduling problem with generalized precedence relations
Cited in
(19)- Multi-mode resource availability cost problem with recruitment and release dates for resources
- Multimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedure
- Resource-constrained project scheduling: A heuristic for the multi-mode case
- Modelling and solving generalised operational surgery scheduling problems
- Project scheduling with multiple modes: A genetic algorithm
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- Mode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problem
- A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting
- A self-adapting genetic algorithm for project scheduling under resource constraints
- scientific article; zbMATH DE number 5061975 (Why is no real title available?)
- An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
- Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization
- A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Solving multi-mode resource-constrained multi-project scheduling problem with combinatorial auction mechanisms
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms
- Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centres
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem