Reactive scheduling in the multi-mode RCPSP
From MaRDI portal
Publication:709110
DOI10.1016/J.COR.2010.01.001zbMATH Open1231.90184OpenAlexW2038344153MaRDI QIDQ709110FDOQ709110
Authors: Filip Deblaere, Erik Demeulemeester, Willy Herroelen
Publication date: 15 October 2010
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2010.01.001
Recommendations
- Disruption management for resource-constrained project scheduling
- Proactive-reactive project scheduling trade-offs and procedures
- A classification of predictive-reactive project scheduling procedures
- Resource-constrained project scheduling: A heuristic for the multi-mode case
- Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
Cites Work
- PSPLIB -- a project scheduling problem library
- Tabu Search—Part I
- A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
- Project scheduling under uncertainty: survey and research potentials
- The multi-mode resource-constrained project scheduling problem with generalized precedence relations
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
- Proactive heuristic procedures for robust project scheduling: An experimental analysis
- A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
- Tabu Search—Part II
- A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags
- Executing production schedules in the face of uncertainties: a review and some future directions
- Hierarchical models for multi-project planning and scheduling
- Rescheduling manufacturing systems: A framework of strategies, policies, and methods
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms
- Project scheduling with multiple modes: A genetic algorithm
- Simulated annealing for multi-mode resource-constrained project scheduling
- Reactive scheduling in the multi-mode RCPSP
- Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- An exact algorithm for project scheduling with multiple modes
- Project scheduling with multiple modes: A comparison of exact algorithms
- Disruption management for resource-constrained project scheduling
- Depth-first iterative-deepening: An optimal admissible tree search
- A note on ``Hierarchical models for multi-project planning and scheduling
- Proactive-reactive project scheduling trade-offs and procedures
Cited In (14)
- A new proactive and reactive approach for resource-constrained project scheduling problem under activity and resource disruption: a scenario-based robust optimization approach
- Integration of turnaround and aircraft recovery to mitigate delay propagation in airline networks
- Bi-objective multi-mode project scheduling under risk aversion
- Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization
- Generating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertainty
- Reactive scheduling in the multi-mode RCPSP
- Determining the timing of project control points using a facility location model and simulation
- Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources
- Proactive policies for the stochastic resource-constrained project scheduling problem
- A Petri net-based framework for realistic project management and scheduling: an application in animation and videogames
- Using the generalized maximum covering location model to control a project's progress
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem
- An approximate dynamic programming approach to project scheduling with uncertain resource availabilities
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
Uses Software
This page was built for publication: Reactive scheduling in the multi-mode RCPSP
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q709110)