Simultaneous optimization of production planning and inventory management of polyurethane foam plant
DOI10.1007/S11081-017-9364-3zbMATH Open1391.90402OpenAlexW2748019395MaRDI QIDQ724341FDOQ724341
Authors: M. A. Rodríguez, Gabriela Corsano, Aldo Vecchietti, Jorge M. Montagna
Publication date: 25 July 2018
Published in: Optimization and Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11081-017-9364-3
Recommendations
- Production planning in continuous process industries: theoretical and optimization issues
- scientific article; zbMATH DE number 770200
- Multi-choice multi-objective mathematical programming model for integrated production planning: a case study
- A linear model for production management-optimal solving policies
- A mixed-integer programming model for an integrated production planning problem with preventive maintenance in the pulp and paper industry
Case-oriented studies in operations research (90B90) Mixed integer programming (90C11) Inventory, storage, reservoirs (90B05) Production models (90B30)
Cites Work
- An improved typology of cutting and packing problems
- An integrated model for warehouse and inventory planning
- Control theory applications to the production–inventory problem: a review
- Symmetry breaking for generalized disjunctive programming formulation of the strip packing problem
- Planning and scheduling of multistage multiproduct batch plants operating under production campaigns
- A novel continuous-time modeling and optimization framework for well platform planning problems
- Short-term operational planning of refined products pipelines
- A disjunctive model for scheduling in a manufacturing and packing facility with intermediate storage
Cited In (3)
- Production planning in continuous process industries: theoretical and optimization issues
- Focused plant optimization strategy for polyethylene multi-grades and multi-sites production
- An optimization model for site-wide scheduling of coupled production plants with an application to the ammonia network of a petrochemical site
This page was built for publication: Simultaneous optimization of production planning and inventory management of polyurethane foam plant
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q724341)