The effects of inspection delay and restoration cost on the optimal inspection and production policy
From MaRDI portal
(Redirected from Publication:724381)
Recommendations
- Note—The Impact of Inspection Delay on Process and Inspection Lot Sizing
- Economic optimization for an imperfect process with inspection errors, inspection time and minimal repair
- scientific article; zbMATH DE number 1156571
- Impact of inspection errors on the lot size problem
- Optimal lot size and offline inspection policy
Cites work
- A common cycle approach for solving the economic lot and inspection scheduling problem
- An EMQ model with inspections and random machine failures
- Note—The Impact of Inspection Delay on Process and Inspection Lot Sizing
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- Optimal production and maintenance policy for imperfect production systems
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- Utilizing an approximative solution to obtain the real optimal solution for a production and inspection model
Cited in
(2)
This page was built for publication: The effects of inspection delay and restoration cost on the optimal inspection and production policy
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q724381)