Modelling and a segmented dynamic programming-based heuristic approach for the slab stack shuffling problem
From MaRDI portal
Publication:732906
DOI10.1016/J.COR.2009.05.011zbMATH Open1175.90406OpenAlexW2035538030MaRDI QIDQ732906FDOQ732906
Authors: Lixin Tang, Huizhi Ren
Publication date: 15 October 2009
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2009.05.011
Recommendations
- An effective heuristic algorithm to minimise stack shuffles in selecting steel slabs from the slab yard for heating and rolling
- Models and algorithms for shuffling problems in steel plants
- Optimising the slab yard planning and crane scheduling problem using a two-stage heuristic
- The slab design problem in the steel industry
- A GRASP heuristic for slab scheduling at continuous casters
Approximation methods and heuristics in mathematical programming (90C59) Dynamic programming (90C39)
Cites Work
- A review of planning and scheduling systems and methods for integrated steel production
- Warehouse design and control: Framework and literature review
- Stowage planning for container ships to reduce the number of shifts
- Hybrid backward and forward dynamic programming based Lagrangian relaxation for single machine scheduling
- Integration of continuous caster and hot strip mill planning for steel production
- A dynamic programming based heuristic for the assembly line balancing problem
- Crane scheduling in container yards with inter-crane interference
- An effective heuristic algorithm to minimise stack shuffles in selecting steel slabs from the slab yard for heating and rolling
Cited In (14)
- Solutions to Real-World Instances of PSPACE-Complete Stacking
- New integer programming models for slab stack shuffling problems
- An effective heuristic algorithm to minimise stack shuffles in selecting steel slabs from the slab yard for heating and rolling
- Sorting with objectives. Graph theoretic concepts in industrial optimization
- Towards optimal formwork pairing on construction sites
- Loading, unloading and premarshalling of stacks in storage areas: survey and classification
- A nested column generation algorithm to the meta slab allocation problem in the steel making industry
- A survey on single crane scheduling in automated storage/retrieval systems
- A polynomial-time dynamic programming algorithm for an optimal picking problem in automated warehouses
- The blocks relocation problem with item families minimizing the number of reshuffles
- Optimising the slab yard planning and crane scheduling problem using a two-stage heuristic
- An exact algorithm for the unrestricted block relocation problem
- The slab design problem in the steel industry
- A generalized classification scheme for crane scheduling with interference
This page was built for publication: Modelling and a segmented dynamic programming-based heuristic approach for the slab stack shuffling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q732906)