Concurrent optimization of harvesting and road network layouts under steep terrain
DOI10.1007/S10479-012-1273-4zbMATH Open1323.90009OpenAlexW2052811612MaRDI QIDQ748552FDOQ748552
Authors: Leo Gallus Bont, Hans Rudolf Heinimann, Richard L. Church
Publication date: 29 October 2015
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: http://doc.rero.ch/record/331271/files/10479_2012_Article_1273.pdf
Recommendations
- scientific article
- Planning for agricultural forage harvesters and trucks: model, heuristics, and case study
- Optimal hierarchical system of a grid road network
- Optimal design of two road networks based on their properties
- A Problem of Forest Harvesting and Road Building Solved Through Model Strengthening and Lagrangean Relaxation
- The combined optimal programming of loading and path planning
- A Primal-dual Steepest-edge Method for Even-flow Harvest Scheduling Problems
- Solving a harvest scheduling optimization problem with constraints on clearcut area and clearcut proximity
- An efficient search algorithm for road network optimization
- Harvest Scheduling Subject to Maximum Area Restrictions: Exploring Exact Approaches
Environmental economics (natural resource models, harvesting, pollution, etc.) (91B76) Mixed integer programming (90C11) Transportation, logistics and supply chain management (90B06)
Cites Work
- On a routing problem
- Integer Programming Formulation of Traveling Salesman Problems
- The maximum covering/shortest path problem: A multiobjective network design and routing formulation
- Heuristic solution approaches to operational forest planning problems
- A tabu search approach for solving a difficult forest harvesting machine location problem
- A Dual-Ascent Procedure for Large-Scale Uncapacitated Network Design
- BEAMR: an exact and approximate model for the \(p\)-median problem
- Strategic route extension in transit networks
- A Combinatorial Heuristic Approach for Solving Real-Size Machinery Location and Road Design Problems in Forestry Planning
- Heuristic concentration: Two stage solution construction
Cited In (5)
- Annual planning of harvesting resources in the forest industry
- The P-Centroid Problem on an Inclined Plane
- Optimization models for forest road upgrade planning
- A tabu search approach for solving a difficult forest harvesting machine location problem
- A Combinatorial Heuristic Approach for Solving Real-Size Machinery Location and Road Design Problems in Forestry Planning
Uses Software
This page was built for publication: Concurrent optimization of harvesting and road network layouts under steep terrain
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q748552)