A note on the flow time and the number of tardy jobs in stochastic open shops
From MaRDI portal
Publication:796445
DOI10.1016/0377-2217(84)90265-0zbMATH Open0543.90061OpenAlexW2085839707MaRDI QIDQ796445FDOQ796445
Authors: Michael L. Pinedo
Publication date: 1984
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(84)90265-0
Recommendations
- Minimizing the expected weighted number of tardy jobs in stochastic flow shops
- Minimizing the Expected Weighted Number of Tardy Jobs in the Stochastic Two-Machine Flow Shop
- A new rule for minimizing the number of tardy jobs in dynamic flow shops
- Minimizing the number of tardy jobs on a proportionate flowshop with general position-dependent processing times
- Stochastic Flow-Shop Scheduling with Lateness-Related Performance Measures
- Minimizing the number of tardy jobs with stochastically-ordered processing times
- scientific article; zbMATH DE number 4068593
- A note on efficient sequences with respect to total flow time and number of tardy jobs
exponential distributionjob shopstochastic schedulingOpen shopsrandom due datespreemptive policytotal expected waiting costtwo machines
Cites Work
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Stochastic Scheduling with Release Dates and Due Dates
- Minimizing Maximum Lateness in a Two-Machine Open Shop
- Title not available (Why is that?)
- Minimizing expected makespan in stochastic open shops
- Title not available (Why is that?)
Cited In (3)
This page was built for publication: A note on the flow time and the number of tardy jobs in stochastic open shops
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q796445)