A note on the flow time and the number of tardy jobs in stochastic open shops
From MaRDI portal
Publication:796445
Recommendations
- Minimizing the expected weighted number of tardy jobs in stochastic flow shops
- Minimizing the Expected Weighted Number of Tardy Jobs in the Stochastic Two-Machine Flow Shop
- A new rule for minimizing the number of tardy jobs in dynamic flow shops
- Minimizing the number of tardy jobs on a proportionate flowshop with general position-dependent processing times
- Stochastic Flow-Shop Scheduling with Lateness-Related Performance Measures
- Minimizing the number of tardy jobs with stochastically-ordered processing times
- scientific article; zbMATH DE number 4068593
- A note on efficient sequences with respect to total flow time and number of tardy jobs
Cites work
- scientific article; zbMATH DE number 3786125 (Why is no real title available?)
- scientific article; zbMATH DE number 3430361 (Why is no real title available?)
- Minimizing Maximum Lateness in a Two-Machine Open Shop
- Minimizing expected makespan in stochastic open shops
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Stochastic Scheduling with Release Dates and Due Dates
Cited in
(3)
This page was built for publication: A note on the flow time and the number of tardy jobs in stochastic open shops
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q796445)