A dynamic production planning and scheduling algorithm for two products processed on one line
From MaRDI portal
(Redirected from Publication:799234)
Recommendations
- scientific article; zbMATH DE number 4137518
- Optimal scheduling of two-component products on a single facility
- Optimal production and setup scheduling: A one-machine, two-product system
- Two-phase algorithm for lot size scheduling in single-stage production systems with parallel facilities
- A Two-Time-Scale Approach for Production Planning in Discrete Time
- Scheduling the production of two-component jobs on a single machine
- Production planning with multiple production lines: Forward algorithm and insights on process design for volume flexibility
- Optimal production planning in pull flow lines with multiple products
- An online approach to dynamic rescheduling for production planning applications
- Integrated Scheduling of Production and Two-Stage Delivery of Make-to-Order Products: Offline and Online Algorithms
Cites work
- scientific article; zbMATH DE number 4009790 (Why is no real title available?)
- A Multi-Product Dynamic Lot-Size Model with Individual and Joint Set-up Costs
- A comparative study of lot sizing procedures for multi-stage assembly systems
- A two product dynamic economic lot size production model with either-or production constraints
- Coordinated replenishments of items under time-varying demand: Dynamic programming formulation
- Dynamic version of the economic lot size model
- Multiple Finite Production Rate Dynamic Lot Size Inventory Models
- Note—On the Deterministic Demand Multi-Product Single-Machine Lot Scheduling Problem
- Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results
- Technical Note—Converting the 0-1 Polynomial Programming Problem to a 0-1 Linear Program
- Technical Note—Generalized Covering Relaxation for 0-1 Programs
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- The Status of Nonlinear Programming Software
Cited in
(4)- Applying a modified coefficient reduction method to a dynamic production scheduling model
- Studying the effects of production loss due to setup in dynamic production scheduling
- Optimising lot sizing and order scheduling with non-linear production rates
- Agile factorial production for a single manufacturing line with multiple products
This page was built for publication: A dynamic production planning and scheduling algorithm for two products processed on one line
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q799234)