Rescheduling traffic on a partially blocked segment of railway with a siding
From MaRDI portal
Publication:828064
DOI10.1134/S0005117920060016zbMATH Open1455.90078MaRDI QIDQ828064FDOQ828064
Authors: E. G. Musatova, Yakov Zinder, Alexander A. Lazarev
Publication date: 14 January 2021
Published in: Automation and Remote Control (Search for Journal in Brave)
Recommendations
- Scheduling the two-way traffic on a single-track railway with a siding
- Scheduling railway traffic at a construction site
- Two-directional traffic scheduling problem solution for a single-track railway with siding
- A branch and bound algorithm for scheduling trains in a railway network
- Efficient scheduling of traffic on a railway line
Cites Work
Cited In (5)
- A novel mixed integer programming model for freight train travel time estimation
- Scheduling railway traffic at a construction site
- On the Scheduling Problem of Cargo Transportation on a Railway Network Segment and Algorithms for Its Solution
- Two-directional traffic scheduling problem solution for a single-track railway with siding
- Traffic management heuristics for bidirectional segments on double-track railway lines
This page was built for publication: Rescheduling traffic on a partially blocked segment of railway with a siding
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q828064)