On track procession assignment problem at the railway network sections
DOI10.1134/S0005117920060028zbMATH Open1455.90066OpenAlexW3034765302MaRDI QIDQ828065FDOQ828065
Authors: D. N. Gainanov, A. N. Ignatov, A. V. Naumov, V. A. Rasskazova
Publication date: 14 January 2021
Published in: Automation and Remote Control (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1134/s0005117920060028
Recommendations
- On time selection for track possession assignment at the railway station
- Solving railway track allocation problems
- Models for railway track allocation
- Scheduling of railway track maintenance activities and crews
- Graph methods for solving the unconstrained and constrained optimal assignment problem for locomotives on a single-line railway section
Reliability, availability, maintenance, inspection in operations research (90B25) Deterministic scheduling theory in operations research (90B35) Mixed integer programming (90C11) Inventory, storage, reservoirs (90B05) Transportation, logistics and supply chain management (90B06)
Cites Work
- A survey of optimization models for train routing and scheduling
- Rescheduling rail networks with maintenance disruptions using problem space search
- Locomotive assignment with heterogeneous consists at CN North America
- Modelling railway freight traffic using the methods of graph theory and combinatorial optimization
- Scheduling the two-way traffic on a single-track railway with a siding
- On Time Selection for Track Possession Assignment at the Railway Station
Cited In (6)
- On the general problem statement of cargo carriages scheduling and ways to solve it
- On the algorithm of cargoes transportation scheduling in the transport network
- On the online track assignment problem
- Scheduling of railway track maintenance activities and crews
- On the Scheduling Problem of Cargo Transportation on a Railway Network Segment and Algorithms for Its Solution
- Linear integer programming model as mathematical ware for an optimal flow production planning system at operational scheduling stage
Uses Software
This page was built for publication: On track procession assignment problem at the railway network sections
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q828065)