Permutation flowshop manufacturing cell scheduling problems with deteriorating jobs and sequence dependent setup times under dominant machines
From MaRDI portal
Publication:828672
DOI10.1007/S11590-018-1322-2zbMath1467.90010OpenAlexW2888780606WikidataQ129321757 ScholiaQ129321757MaRDI QIDQ828672
Shaojun Lu, Panos M. Pardalos, Jun Pei, Xin-Bao Liu
Publication date: 5 May 2021
Published in: Optimization Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11590-018-1322-2
Related Items (2)
An asymmetric traveling salesman problem based matheuristic algorithm for flowshop group scheduling problem ⋮ Scheduling piecewise linear deteriorating jobs to minimize makespan in a two-machine flowshop
Cites Work
- Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan
- Minimizing makespan in three-machine flow shops with deteriorating jobs
- Solution algorithms for synchronous flow shop problems with two dominating machines
- Serial-batching scheduling with time-dependent setup time and effects of deterioration and learning on a single-machine
- Scheduling deteriorating jobs on a single serial-batching machine with multiple job types and sequence-dependent setup times
- Flow shop scheduling with effects of learning and deterioration
- Minimizing the total completion time in permutation flow shop with machine-dependent job deterioration rates
- A fast tabu search algorithm for the permutation flow-shop problem
- Flowshop scheduling with dominant machines
- A concise survey of scheduling with time-dependent processing times
- Competitive two-agent scheduling with deteriorating jobs on a single parallel-batching machine
- Serial-batching group scheduling with release times and the combined effects of deterioration and truncated job-dependent learning
- Single machine serial-batching scheduling with independent setup time and deteriorating job processing times
- Research on no-idle permutation flowshop scheduling with time-dependent learning effect and deteriorating jobs
- Scheduling two agents with sum-of-processing-times-based deterioration on a single machine
- Single-machine scheduling problems with past-sequence-dependent setup times
- Bicriteria hierarchical optimization of two-machine flow shop scheduling problem with time-dependent deteriorating jobs
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Two‐machine flowshop scheduling with conditional deteriorating second operations
This page was built for publication: Permutation flowshop manufacturing cell scheduling problems with deteriorating jobs and sequence dependent setup times under dominant machines