Online production planning to maximize the number of on-time orders
From MaRDI portal
Publication:829183
DOI10.1007/S10479-018-2928-6zbMATH Open1467.90007OpenAlexW2810224082WikidataQ129645351 ScholiaQ129645351MaRDI QIDQ829183FDOQ829183
Authors: Nicholas G. Hall, Marc E. Posner, Chris N. Potts
Publication date: 5 May 2021
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://eprints.soton.ac.uk/422682/1/PlanningHorizonsAcceptedAnnOR.pdf
Recommendations
- On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time
- On-line production order scheduling with preemption penalties
- An online approach to dynamic rescheduling for production planning applications
- On-line integrated production-distribution scheduling problems with capacitated deliveries
- Algorithmic Applications in Management
Cites Work
- Title not available (Why is that?)
- Title not available (Why is that?)
- Scheduling. Theory, algorithms, and systems.
- Bounds for Certain Multiprocessing Anomalies
- An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
- On-line scheduling on a single machine: Maximizing the number of early jobs
- Online scheduling with known arrival times
- Time bounds for selection
- Matchup Scheduling with Multiple Resources, Release Dates and Disruptions
- A Periodic Review, Production Planning Model with Uncertain Capacity and Uncertain Demand—Optimality of Extended Myopic Policies
- On-line production order scheduling with preemption penalties
- How much can lookahead help in online single machine scheduling
- Lower bounds on online deadline scheduling with preemption penalties
- An O\((n^4)\) algorithm for preemptive scheduling of a single machine to minimize the number of late jobs
- Online Scheduling of Equal‐Length Jobs: Randomization and Restarts Help
- Optimality of Myopic Inventory Policies for Several Substitute Products
- Production Planning Over Time and the Nature of the Expectation and Planning Horizon
- Horizon Effects in Aggregate Production Planning with Seasonal Demand
Cited In (4)
This page was built for publication: Online production planning to maximize the number of on-time orders
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q829183)