A bicriteria parallel machine scheduling with a learning effect of setup and removal times

From MaRDI portal
Publication:840149


DOI10.1016/j.apm.2008.01.010zbMath1168.90436MaRDI QIDQ840149

Tamer Eren

Publication date: 5 September 2009

Published in: Applied Mathematical Modelling (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.apm.2008.01.010


90B35: Deterministic scheduling theory in operations research


Related Items

A Note on Scheduling Jobs with Extended Sum-of-Processing-Times-Based and Position-Based Learning Effect, A lexicographic optimization approach for a bi-objective parallel-machine scheduling problem minimizing total quality loss and total tardiness, The third comprehensive survey on scheduling problems with setup times/costs, Single machine past-sequence-dependent setup times scheduling with general position-dependent and time-dependent learning effects, Single-machine scheduling with deteriorating jobs and past-sequence-dependent setup times, Single machine scheduling with exponential sum-of-logarithm-processing-times based learning effect, Comments on ``A bicriteria parallel machine scheduling with a learning effect of setup and removal times, Single-machine due-window assignment problem with learning effect and deteriorating jobs, Worst-case behavior of simple sequencing rules in flow shop scheduling with general position-dependent learning effects, A bicriteria \(m\)-machine flowshop scheduling with sequence-dependent setup times, A due-date assignment problem with learning effect and deteriorating jobs, A note on minimizing maximum lateness in an \(m\)-machine scheduling problem with a learning effect, Scheduling problems with past-sequence-dependent setup times and general effects of deterioration and learning, Single-machine and parallel-machine serial-batching scheduling problems with position-based learning effect and linear setup time, Some single-machine scheduling with sum-of-processing-time-based and job-position-based processing times, Several single-machine scheduling problems with general learning effects, Study on flow shop scheduling with sum-of-logarithm-processing-times-based learning effects, Scheduling jobs with position and sum-of-processing-time based processing times, Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times, Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects, Single-Machine Due-Window Assignment and Scheduling with Learning Effect and Resource-Dependent Processing Times



Cites Work