Optimal periodic replacement policy for repairable products under free-repair warranty
From MaRDI portal
Publication:853045
DOI10.1016/J.EJOR.2005.10.047zbMATH Open1110.90035OpenAlexW2082627338MaRDI QIDQ853045FDOQ853045
Ming-Yuh Chen, Ruey Huei Yeh, Chen-Yi Lin
Publication date: 15 November 2006
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2005.10.047
Cites Work
- Title not available (Why is that?)
- Optimum Preventive Maintenance Policies
- Product warranty management. I: A taxonomy for warranty policies
- An Optimal Policy for Servicing Warranty
- Periodic Replacement with Increasing Minimal Repair Costs at Failure
- Periodic replacement when minimal repair costs vary with time
- Optimal replace-repair strategy for servicing products sold with warranty
- Product warranty management. III: A review of mathematical models
- Periodic replacement with minimal repair at failure and general cost function
Cited In (23)
- Effect of warranty and quantity discounts on a deteriorating production system with a Markovian production process and allowable shortages
- On optimal preventive-maintenance policy for generalized Polya process repairable products under free-repair warranty
- An Optimal Age for Preventive Replacement Under Fully Renewing Combination Free Replacement and Pro Rata Warranty
- OPTIMAL INSPECTION SCHEDULE IN AN IMPERFECT EMQ MODEL WITH FREE REPAIR WARRANTY POLICY(<Special Issue>Advanced Planning and Scheduling for Supply Chain Management)
- Optimal discrete-time periodic replacement policy for repairable products under free minimal repair warranty
- Periodic replacement policies with shortage and excess costs
- A customized two-dimensional extended warranty with preventive maintenance
- Optimal single-replacement for repairable products with different failure rate under a finite planning horizon
- Optimal warranty policies for systems with imperfect repair
- Product and After-Sales Maintenance Service Pricing Decisions in a Risk-Averse Supply Chain
- Optimal replace-repair strategy for servicing products sold with warranty
- Optimal loading of system with random repair time
- A geometric process warranty model using a combination policy
- On information-based warranty policy for repairable products from heterogeneous population
- Optimal production run length and warranty period for an imperfect production system under selling price dependent on warranty period
- Repair-replace strategies for two-dimensional warranty policies
- Title not available (Why is that?)
- Optimal production run in an imperfect production process with maintenance under warranty and product insurance
- Maintenance models in warranty: a literature review
- Optimal age-replacement policy for repairable products under renewing free-replacement warranty
- On a conjecture of optimal repair-replacement strategies for warranted products
- The optimal used period of repairable product with leadtime after the warranty expiry
- Optimal replacement policy based on maximum repair time for a random shock and wear model
This page was built for publication: Optimal periodic replacement policy for repairable products under free-repair warranty
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q853045)