Scheduling of FMSs with information delays: a simulation study
From MaRDI portal
Publication:853751
DOI10.1007/S10696-005-5993-5zbMATH Open1101.90354OpenAlexW2054687021MaRDI QIDQ853751FDOQ853751
Rahul Caprihan, Subhash Wadhwa
Publication date: 17 November 2006
Published in: International Journal of Flexible Manufacturing Systems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10696-005-5993-5
SimulationDynamic sequencing and dispatchingInformation delaysRouting flexibilityTaguchi experimental design
Cites Work
- Title not available (Why is that?)
- Fuzzy systems for control of flexible machines operating under information delays
- On the consequences of information delays in the scheduling of semi-automated flexible machines
- A real-time methodology for minimizing mean flowtime in FMSs with routing flexibility: threshold-based alternate routing
- Effects of loading and routeing decisions on performance of flexible manufacturing systems
- Job shop scheduling with alternative machines
- Flexible process plans: their value in flexible automation systems
- A real-time methodology for minimizing mean flowtime in FMSs with machine breakdowns: threshold-based selective rerouting
- Reactive scheduling in a dynamic and stochastic FMS environment
- Auction-based distributed scheduling and control scheme for flexible manufacturing systems
Cited In (3)
This page was built for publication: Scheduling of FMSs with information delays: a simulation study
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q853751)