Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system
From MaRDI portal
Publication:856147
DOI10.1016/J.AMC.2006.02.033zbMATH Open1102.90358OpenAlexW1995386558MaRDI QIDQ856147FDOQ856147
Alireza Rahimi-Vahed, R. Tavakkoli-Moghaddam
Publication date: 7 December 2006
Published in: Applied Mathematics and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.amc.2006.02.033
Cites Work
- Title not available (Why is that?)
- Title not available (Why is that?)
- A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines.
- A branch-and-bound algorithm for a single machine sequencing to minimize the sum of maximum earliness and tardiness with idle insert
- A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines
- Optimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- An analytic framework for sequencing mixed model assembly lines
- Sequencing mixed-model assembly lines to level parts usage and minimize line length
- Note—Sequencing JIT Mixed-Model Assembly Lines
- A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems
- Stochastic Algorithms: Foundations and Applications
- Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems
Cited In (13)
- Sequencing Mixed-Model Assembly Lines with Limited Intermediate Buffers by a GA/SA-Based Algorithm
- Multi-objective optimal scheduling of reconfigurable assembly line for cloud manufacturing
- A parametric procedure for multicriterion sequence scheduling for JustIn-Time mixed-model assembly lines
- Lean holistic fuzzy methodology employing cross-functional worker teams for new product development projects: a real case study from high-tech industry
- A comparative study of performance measures for throughput of a mixed model assembly line in a JIT environment
- Sequencing mixed-model assembly lines: survey, classification and model critique
- Sequencing mixed-model assembly lines with demand management: problem development and efficient multi-objective algorithms
- A genetic regulatory network based method for multi-objective sequencing problem in mixed-model assembly lines
- Applying available-to-promise (ATP) concept in mixed-model assembly line sequencing problems in a make-to-order (MTO) environment: problem extension, model formulation and Lagrangian relaxation algorithm
- A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines.
- GRASP with path relinking for a multiple objective sequencing problem for a mixed-model assembly line
- Interactive bicriterion decision support for a large scale industrial scheduling system
- A bi-objective mixed-model assembly line sequencing problem considering customer satisfaction and customer buying behaviour
Uses Software
Recommendations
- A New Approach for Mixed-Model Assembly Line Sequencing 👍 👎
- Balancing and sequencing mixed-model just-in-time \(U\)-lines with multiple objectives 👍 👎
- A simple sequencing algorithm for mixed-model assembly lines in just-in- time production systems 👍 👎
- Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems 👍 👎
- Bicriteria sequencing for just-in-time mixed-model assembly lines 👍 👎
This page was built for publication: Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q856147)