Maintenance routing for train units: the interchange model
DOI10.1016/J.COR.2005.05.026zbMATH Open1102.90306OpenAlexW2052019601MaRDI QIDQ856690FDOQ856690
Authors: Gábor Maróti, Leo Kroon
Publication date: 7 December 2006
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2005.05.026
Recommendations
Programming involving graphs or networks (90C35) Reliability, availability, maintenance, inspection in operations research (90B25) Transportation, logistics and supply chain management (90B06)
Cites Work
Cited In (8)
- Optimization models for multi-period railway rolling stock assignment
- Asset replacement for an urban railway using a modified two-cycle replacement model
- An integrated heuristic and mathematical modelling method to optimize vehicle maintenance schedule under single dead-end track parking and service level agreement
- Recursive operation time maximization model for the maintenance of power generation equipment
- Application of multiple-population genetic algorithm in optimizing the train-set circulation plan problem
- Tristage bargaining dynamic game-based preventive maintenance for electric multiple unit
- Scheduling preventive railway maintenance activities
- Improving the robustness in railway station areas
This page was built for publication: Maintenance routing for train units: the interchange model
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q856690)