A scheduling policy for adjusting economic lot quantities to a feasible solution
From MaRDI portal
Publication:858454
DOI10.1016/j.ejor.2006.03.038zbMath1111.90044MaRDI QIDQ858454
Publication date: 9 January 2007
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2006.03.038
Related Items
Cites Work
- Unnamed Item
- An extension of the extended basic period approach for economic lot scheduling problems
- A search heuristic for the sequence-dependent economic lot scheduling problem
- A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands
- Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-Item, Single-Machine
- The Cyclic Lot Scheduling Problem with Sequence-Dependent Setups
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- Scheduling Rules For The Multiple Product Single Machine System With Stochastic Demand
- Multi-item, single-machine scheduling problem with stochastic demands: a comparison of heuristics
- A Dynamic Programming Approach to a Lot Size Scheduling Problem
- Forecasting and Stock Control for Intermittent Demands
- Scheduling the Production of Several Items with Random Demands in a Single Facility