Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case
From MaRDI portal
(Redirected from Publication:864823)
WARNING: Page is not linked to a MaRDI-Entity. Please add Sitelink / Wikibase-link.