Flow shop scheduling problems with decreasing linear deterioration under dominant machines
From MaRDI portal
(Redirected from Publication:868141)
Recommendations
- Flow shop scheduling problems with deteriorating jobs under dominating machines
- Flow shop scheduling problems with deteriorating jobs on no-idle dominant machines
- A note on flow shop scheduling problems with deteriorating jobs on no-idle dominant machines
- Flowshop scheduling with dominant machines
- Flow shop scheduling problems with time-dependent processing times on dominated machines
- Some single-machine and flowshop scheduling problems with a non-linear deterioration function
- Scheduling piecewise linear deteriorating jobs to minimize makespan in a two-machine flowshop
- Flow shop scheduling problems under machine-dependent precedence constraints
- A note on the complexity of flow-shop scheduling with deteriorating jobs
Cites work
- scientific article; zbMATH DE number 7618570 (Why is no real title available?)
- A concise survey of efficiently solvable special cases of the permutation flow-shop problem
- A concise survey of scheduling with time-dependent processing times
- Complexity analysis of job-shop scheduling with deteriorating jobs
- Complexity of scheduling tasks with time-dependent execution times
- Flow shop scheduling problems with deteriorating jobs under dominating machines
- Flow-shops with a dominant machine
- Flowshop scheduling with dominant machines
- Flowshop/no-idle or no-wait scheduling to minimize the sum of completion times
- No-wait or no-idle permutation flowshop scheduling with dominating machines
- Nonpreemptive flowshop scheduling with machine dominance
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Scheduling Deteriorating Jobs on a Single Processor
- Scheduling jobs under decreasing linear deterioration
- Scheduling jobs under simple linear deterioration
- Scheduling jobs with position-dependent processing times
- Scheduling start time dependent jobs to minimize the total weighted completion time
- Scheduling with time dependent processing times: Review and extensions
- Single machine scheduling with step-deteriorating processing times
- The Three-Machine No-Wait Flow Shop is NP-Complete
- The complexity of scheduling starting time dependent tasks with release times
- V-Shaped Policies for Scheduling Deteriorating Jobs
Cited in
(26)- Scheduling of computational processes in real-time distributed systems with uncertain task execution times
- A survey of scheduling problems with no-wait in process
- A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: weighted mean completion time and weighted mean tardiness
- Minimizing makespan in permutation flow shop scheduling with proportional deterioration
- Makespan minimization in machine dominated flowshop
- The Browne-Yechiali single-machine sequence is optimal for flow-shops
- Flow-shops with a dominant machine
- Makespan minimization on three-machine flow shop with deteriorating jobs
- scientific article; zbMATH DE number 2186529 (Why is no real title available?)
- Single machine group scheduling under decreasing linear deterioration
- Single machine quadratic penalty function scheduling with deteriorating jobs and group technology
- Single machine group scheduling with time dependent processing times and ready times
- General Flowshop Models: Job Dependent Capacities, Job Overlapping and Deterioration
- A note on single-machine scheduling with decreasing time-dependent job processing times
- Single-machine scheduling with linear decreasing deterioration to minimize earliness penalties
- Optimal four-machine flow shop scheduling with dominance condition
- Flow shops with machine maintenance: ordered and proportionate cases
- A note on flow shop scheduling problems with deteriorating jobs on no-idle dominant machines
- Flow shop scheduling problems with time-dependent processing times on dominated machines
- Permutation flow shop scheduling with dominant machines to minimize discounted total weighted completion time
- Parallel identical machines scheduling with deteriorating jobs and total absolute differences penalties
- Flow shop scheduling problems with deteriorating jobs under dominating machines
- Parallel machine earliness/tardiness scheduling problem under the effects of position based learning and linear/nonlinear deterioration
- Flow shop scheduling problems with deteriorating jobs on no-idle dominant machines
- Scheduling problems with past-sequence-dependent setup times and general effects of deterioration and learning
- Scheduling jobs under decreasing linear deterioration
This page was built for publication: Flow shop scheduling problems with decreasing linear deterioration under dominant machines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q868141)