Minimizing the weighted number of early and tardy jobs in a stochastic single machine scheduling problem
From MaRDI portal
Publication:872264
DOI10.1016/J.EJOR.2006.05.036zbMATH Open1121.90064OpenAlexW2133204269MaRDI QIDQ872264FDOQ872264
Publication date: 27 March 2007
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2006.05.036
Recommendations
- Single machine scheduling with stochastic processing times or stochastic due-date to minimize the number of early and tardy jobs
- Scheduling stochastic jobs on a single machine to minimize weighted number of tardy jobs
- Stochastic single machine scheduling to minimize the weighted number of tardy jobs
- Minimising a weighted quadratic function of job lateness in the stochastic single machine scheduling problem
- On the minimization of the weighted number of tardy jobs with random processing times and deadline
Cites Work
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- Dynamic scheduling of stochastic jobs on a single machine
- Machine scheduling with earliness, tardiness and non-execution penalties
- Sequencing with Earliness and Tardiness Penalties: A Review
- Sequencing jobs on a single machine with a common due data and stochastic processing times
- The stochastic single machine scheduling problem with earliness and tardiness costs
- Earliness-tardiness scheduling with setup considerations
- Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs
- Note—On Baluts Algorithm and NP-Completeness for a Chance-Constrained Scheduling Problem
- Stochastic Scheduling with Release Dates and Due Dates
- The Single Machine Early/Tardy Problem
- Title not available (Why is that?)
- Scheduling to Minimize the Number of Late Jobs When Set-Up and Processing Times are Uncertain
- Stochastic Single Machine Scheduling with Quadratic Early-Tardy Penalties
- Minimizing the expected weighted number of tardy jobs in stochastic flow shops
- Single machine scheduling to minimize the number of early and tardy jobs
- Algorithm for minimizing weighted earliness penalty in single-machine problem
- Inference for the crossing point of two continuous cdf's
- Single-machine scheduling with exponential processing times and general stochastic cost functions
- The single-machine absolute-deviation early-tardy problem with random completion times
Cited In (23)
- Minimizing the expected weighted number of tardy jobs in stochastic flow shops
- Minimizing weighted tardiness of jobs with stochastic interruptions in parallel machines
- Single machine scheduling with release dates: a distributionally robust approach
- Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times
- Single machine scheduling with stochastic processing times or stochastic due-date to minimize the number of early and tardy jobs
- Distributionally robust single machine scheduling with the total tardiness criterion
- Distributionally robust single machine scheduling with risk aversion
- A stochastic approach for the single-machine scheduling problem to minimize total expected cost with client-dependent tardiness costs
- Solving a stochastic single machine problem with initial idle time and quadratic objective
- Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time
- Minimizing the Expected Weighted Number of Tardy Jobs in the Stochastic Two-Machine Flow Shop
- Stochastic single machine scheduling problem as a multi-stage dynamic random decision process
- Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness
- Robust scheduling on a single machine to minimize total flow time
- A survey of single machine scheduling to minimize weighted number of tardy jobs
- A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times
- Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates
- Minimizing total completion time in a two-machine no-wait flowshop with uncertain and bounded setup times
- On the minimization of the weighted number of tardy jobs with random processing times and deadline
- Significantly improved dominance relation for no-wait flowshop scheduling problems with uncertain setup times
- Minimizing the number of tardy jobs with stochastically-ordered processing times
- Target-based distributionally robust optimization for single machine scheduling
- Bi-objective single machine scheduling problem with stochastic processing times
This page was built for publication: Minimizing the weighted number of early and tardy jobs in a stochastic single machine scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q872264)